Power Substation
Project Info
- Created
- Aug 25, 2020
- Modified
- Jan 21, 2022
- Size
- 2.2 GB
- Acres
- 33
- Format
- .las
Location
Data captured with the ROCK R1A on the DJI M210 drone. The approximate time for flying the mission, including equipment setup and tear-down, was 1 hr. For the complex structure, a cross-hatch mission was flown to capture the best detail.
Uploaded
Horizontal
WGS 84
EPSG:
4326
Unit:
m
Proj4:
+proj=longlat +datum=WGS84 +no_defs
OGC WKT:
GEOGCS["WGS 84",DATUM["WGS_1984",SPHEROID["WGS 84",6378137,298.257223563,AUTHORITY["EPSG","7030"]],AUTHORITY["EPSG","6326"]],PRIMEM["Greenwich",0,AUTHORITY["EPSG","8901"]],UNIT["degree",0.0174532925199433,AUTHORITY["EPSG","9122"]],AUTHORITY["EPSG","4326"]]
WGS 84 (2010)